Number
|
Project name
|
Head
|
Contract funds(10thousand¥)
|
The starting time
|
The Ending time
|
1
|
Shenzhen
citizen center DaWuDing intelligent health monitoring
|
Wei-lian
qu
|
280
|
2003.05
|
2008.12
|
2
|
Huang
Bei river panlong bridge engineering detection
|
Zhe-an
lu
|
70
|
2003.12
|
2004.12
|
3
|
Qiao
moraine hydropower plant and stability of underground caverns engineering
prototype observation research
|
Li
Xinping
|
251.6
|
2004.1
|
2006.3
|
4
|
The
south ring road of wuhan three loop line segment (qing ling - wild zhi)
bridge engineering tests
|
Mu-yu
liu
|
200.9
|
2005.03
|
2006.12
|
5
|
Wuhan
outer supporting engineering construction
|
Zhe-an
lu
|
60
|
2005.11
|
2006.12
|
6
|
Waterfall
gully spillway engineering construction of prototype observation and slope
stability study
|
Li
Xinping
|
199.8813
|
2005.11
|
2008.11
|
7
|
Wu
Hansan loop south ring section of the project completion of dynamic and
static load test
|
Mu-yu
liu
|
61.5
|
2006.01
|
2007.12
|
8
|
Experimental
study on the prestressed large-span hollow floor slab
|
Zhe-an
lu
|
60
|
2006.03
|
2007.08
|
9
|
With
yue highway in hubei province middle hanjiang bridge monitoring
|
Mu-yu
liu
|
79
|
2006.06
|
2007.12
|
10
|
Large
north expressway soft foundation processing monitoring and test
|
Li
Xinping
|
59.54
|
2006.06
|
2006.12
|
11
|
On
the left bank underground power station engineering blasting test and
construction safety monitoring
|
Li
Xinping
|
83.1865
|
2006.07
|
2009.12
|
12
|
DaGang
landscape plant on the right bank diversion tunnel prototype observation and
research
|
Li
Xinping
|
115.0877
|
2007.01
|
2007.12
|
13
|
Deep
gulley hydropower plant dam hub engineering prototype observation
|
Li
Xinping
|
549.87
|
2007.03
|
2012.03
|
14
|
Prototype
observation research
|
Li
Xinping
|
114.38
|
2007.03
|
2008.03
|
15
|
Waterfall
gully dam engineering prototype observation and analysis
|
Li
Xinping
|
145
|
2007.03
|
2010.12
|
16
|
The
slope safety monitoring project
|
Li
Xinping
|
320
|
2007.09
|
2008.1
|
17
|
BaiQuan
west town has built two phase of the energy conservation and emissions
reduction technology application research
|
Zhe-an
lu
|
70
|
2008.01
|
2009.12
|
18
|
Large
MRF damper and its control system
|
Jian-wei
tu
|
450
|
2008.06
|
2008.12
|
19
|
Three
towers cable-stayed bridge structure nonlinear spatial finite element
simulation analysis and experimental research
|
Mu-yu
liu
|
80
|
2009.05
|
2010.12
|
20
|
Wuhan
rail transit line 4 construction monitoring
|
Zhou
qiang
|
82.09
|
2009.12
|
2011.12
|
21
|
Dadu
river DaGang landscape power station dam safety monitoring project
|
Li
Xinping
|
92.14
|
2009.08
|
2011.12
|
22
|
Wuhan
east third ring bridge engineering detection
|
Mu-yu
liu
|
150.72
|
2010.05
|
2011.05
|
23
|
Dadu
river DaGang shanshui station hub area slope monitoring feedback analysis and
research
|
Li
Xinping
|
159.7635
|
2010.11
|
2015.12
|
24
|
DaGang
landscape and flood discharge energy dissipation power station dam safety
monitoring research and construction of buildings
|
Li
Xinping
|
240.189
|
2010.07
|
2012.12
|
25
|
Wuhan
rail transit line 4 construction monitoring
|
Zhou
qiang
|
67.91
|
2011.01
|
2013.12
|
26
|
Dam
concrete bucket positioning control and construction information management
system
|
Li
Xinping
|
155
|
2011.04
|
2015.04
|
27
|
Guan
hui inter-city railway lines company intends to bridge construction
monitoring
|
Zhe-an
lu
|
75
|
2011.07
|
2012.12
|
28
|
Hong
kong-zhuhai-macao bridge composite continuous box girder manufacture and installation
of key technology and operation stage performance study
|
Mu-yu
liu
|
112.5
|
2011.04
|
2012.04
|
29
|
The
monkey rock hydropower station dam during construction period temporary
safety monitoring and analysis of detection
|
Li
Xinping
|
387.26
|
2011.12
|
2015.12
|
30
|
Dadu
river flood discharge tunnel DaGang landscape plant during temporary
construction safety monitoring and research
|
Li
Xinping
|
117.29
|
2011.07
|
2014.04
|
31
|
Wu
east temporary safety monitoring during construction period are on the left
bank hydropower station diversion tunnel construction
|
Li
Xinping
|
77.5
|
2012.02
|
2012.12
|
32
|
Form
a complete set of erqi changjiang river bridge in wuhan engineering Wu
Changan of dynamic and static load test contract
|
Mu-yu
liu
|
133.496
|
2012.05
|
2012.12
|
33
|
Give
a male bureau shanghai-kunming designed in hunan CKTJ - IV standard
continuous beam construction monitoring
|
Zhe-an
lu
|
115
|
2012.06
|
2014.06
|
34
|
Surge
tank, pressure pipe, workshop closed state hydropower station construction
installation engineering
|
Li
Xinping
|
102.545
|
2010.11
|
2013.06
|
35
|
Based
on real-time geographic information of rainfall induced tower base disaster warning
systems research and application
|
Chen
bo
|
102
|
2013.1
|
2014.12
|
36
|
Sri
Lanka's first reservoir project safety monitoring and analysis
|
Li
Xinping
|
1061.5155
|
2013.01
|
2013.12
|
37
|
Double
river hydropower station dam abutment excavation and supporting project
construction safety monitoring and research
|
Li
Xinping
|
148
|
2009.01
|
2014.12
|