Laboratory for horizontal major scientific research projects


Number

Project name

Head

Contract funds(10thousand)

The starting time

The Ending time

1

Shenzhen citizen center DaWuDing intelligent health monitoring

Wei-lian qu

280

2003.05

2008.12

2

Huang Bei river panlong bridge engineering detection

Zhe-an lu

70

2003.12

2004.12

3

Qiao moraine hydropower plant and stability of underground caverns engineering prototype observation research

Li Xinping

251.6

2004.1

2006.3

4

The south ring road of wuhan three loop line segment (qing ling - wild zhi) bridge engineering tests

Mu-yu liu

200.9

2005.03

2006.12

5

Wuhan outer supporting engineering construction

Zhe-an lu

60

2005.11

2006.12

6

Waterfall gully spillway engineering construction of prototype observation and slope stability study

Li Xinping

199.8813

2005.11

2008.11

7

Wu Hansan loop south ring section of the project completion of dynamic and static load test 

Mu-yu liu

61.5

2006.01

2007.12

8

Experimental study on the prestressed large-span hollow floor slab

Zhe-an lu

60

2006.03

2007.08

9

With yue highway in hubei province middle hanjiang bridge monitoring

Mu-yu liu

79

2006.06

2007.12

10

Large north expressway soft foundation processing monitoring and test

Li Xinping

59.54

2006.06

2006.12

11

On the left bank underground power station engineering blasting test and construction   safety monitoring

Li Xinping

83.1865

2006.07

2009.12

12

DaGang landscape plant on the right bank diversion tunnel prototype observation and research

Li Xinping

115.0877

2007.01

2007.12

13

Deep gulley hydropower plant dam hub engineering prototype observation

Li Xinping

549.87

2007.03

2012.03

14

Prototype observation research

Li Xinping

114.38

2007.03

2008.03

15

Waterfall gully dam engineering prototype observation and analysis

Li Xinping

145

2007.03

2010.12

16

The slope safety monitoring project

Li Xinping

320

2007.09

2008.1

17

BaiQuan west town has built two phase of the energy conservation and emissions reduction technology application research

Zhe-an lu

70

2008.01

2009.12

18

Large MRF damper and its control system

Jian-wei tu

450

2008.06

2008.12

19

Three towers cable-stayed bridge structure nonlinear spatial finite element simulation analysis and experimental research

Mu-yu liu

80

2009.05

2010.12

20

Wuhan rail transit line 4 construction monitoring

Zhou qiang

82.09

2009.12

2011.12

21

Dadu river DaGang landscape power station dam safety monitoring project

Li Xinping

92.14

2009.08

2011.12

22

Wuhan east third ring bridge engineering detection

Mu-yu liu

150.72

2010.05

2011.05

23

Dadu river DaGang shanshui station hub area slope monitoring feedback analysis and research

Li Xinping

159.7635

2010.11

2015.12

24

DaGang landscape and flood discharge energy dissipation power station dam safety monitoring research and construction of buildings

Li Xinping

240.189

2010.07

2012.12

25

Wuhan rail transit line 4 construction monitoring

Zhou qiang

67.91

2011.01

2013.12

26

Dam concrete bucket positioning control and construction information management system

Li Xinping

155

2011.04

2015.04

27

Guan hui inter-city railway lines company intends to bridge construction monitoring

Zhe-an lu

75

2011.07

2012.12

28

Hong kong-zhuhai-macao bridge composite continuous box girder manufacture and installation of key technology and operation stage performance study

Mu-yu liu

112.5

2011.04

2012.04

29

The monkey rock hydropower station dam during construction period temporary safety monitoring and analysis of detection

Li Xinping

387.26

2011.12

2015.12

30

Dadu river flood discharge tunnel DaGang landscape plant during temporary construction safety monitoring and research

Li Xinping

117.29

2011.07

2014.04

31

Wu east temporary safety monitoring during construction period are on the left bank hydropower station diversion tunnel construction

Li Xinping

77.5

2012.02

2012.12

32

Form a complete set of erqi changjiang river bridge in wuhan engineering Wu Changan of dynamic and static load test contract

Mu-yu liu

133.496

2012.05

2012.12

33

Give a male bureau shanghai-kunming designed in hunan CKTJ - IV standard continuous beam construction monitoring

Zhe-an lu

115

2012.06

2014.06

34

Surge tank, pressure pipe, workshop closed state hydropower station construction installation engineering

Li Xinping

102.545

2010.11

2013.06

35

Based on real-time geographic information of rainfall induced tower base disaster warning systems research and application

Chen bo

                       102

         2013.1

        2014.12

36

Sri Lanka's first reservoir project safety monitoring and analysis

Li Xinping

              1061.5155

        2013.01

        2013.12

37

Double river hydropower station dam abutment excavation and supporting project construction safety monitoring and research

Li Xinping

                       148

         2009.01

         2014.12